Skip to content
paldb.gg
Structure · Milling_Crusher
Crusher

Crusher Palworld structure

A milling_crusher structure in Palworld.

Wood
×50
Stone
×20
Paldium Fragment
×10
Game data
Exact values extracted from Palworld's game files.
Source
DT_BuildObjectDataTable
Build
4570874460
Confidence
exact
How paldb sources its data
Work to build
8,000
Max per base
No limit
Power
None
Type
Prod_Craft
Rank
1

The Crusher costs 50 Wood to place, more than any other material it needs, and is unlocked by the Crusher technology at level 8.

Build cost

Unlocked by Crusher.

Wood
Wood
Material
×50
Stone
Stone
Material
×20
Paldium Fragment×10

Workers

Game data
Exact values extracted from Palworld's game files.
Source
DT_MapObjectAssignData
Build
4570874460
Confidence
exact
How paldb sources its data

Crusher needs Watering.

Working it costs a Pal -0.11 sanity per cycle, which is why a base running hot needs food and beds more than it needs more workers.

Plan a base to total these across every structure you place, then build the team that covers them.

Other milling_crusher structures

Nearest to it by build cost in the same category: Mill (60) and Cryogenic Crusher (125). Every structure the game ships is on the buildings list.

Extracted from Palworld's game files on (build 4570874460).Methodology